A revision-aware source index
Project, discipline, sheet, detail, issue status, and superseded versions stay distinguishable.
Prepare requests for information with the drawing references, revision history, and open questions a project team needs to route them correctly.
A field question can reference a superseded plan while a similar RFI already has an answer. Repeating or misrouting it creates avoidable coordination work. The goal is a traceable clarification request, not an AI interpretation that authorizes construction.
Choose one project, one discipline, and its approved document register. Name the RFI coordinator and the design authority responsible for answers.
A superintendent raises a clash question with a marked-up drawing and location reference.
Match sheet and detail identifiers to the approved revision register, check related RFIs, and surface superseded references or unclear locations.
Prepare an RFI draft with the question, source references, related responses, requested decision, and routing suggestion. Cost or schedule effects are questions unless confirmed by their owners.
The project coordinator checks and issues the request. The designated architect or engineer supplies the authoritative response; field changes follow the project’s approval procedure.
Project, discipline, sheet, detail, issue status, and superseded versions stay distinguishable.
Keep the actual field question beside marked-up evidence and potential duplicate requests.
Track confirmed responses, unresolved questions, and revision changes without treating a draft answer as permission to build.
Choose one project, one discipline, and its approved document register. Name the RFI coordinator and the design authority responsible for answers.
Keep the actual field question beside marked-up evidence and potential duplicate requests.
Include identical sheet numbers from separate projects, a sketch with no revision, an answered RFI later superseded by a bulletin, and a question requiring multiple disciplines.
Agree the trigger, source systems, reviewer, and acceptance criteria. Build the bounded preparation path, then test it with the person who will own it.
Include identical sheet numbers from separate projects, a sketch with no revision, an answered RFI later superseded by a bulletin, and a question requiring multiple disciplines.
No engineering advice, design approval, automatic change order, or instruction to proceed. The project’s licensed professionals and contractual authorities retain responsibility.
See how acceptance evidence works ↗It can retrieve a previously approved response and show its context. A new design interpretation needs the authorized professional.
Only with explicit access separation and project identifiers. A correct-looking answer from the wrong project is an unacceptable handoff.