AI for Construction

Keep the question clear. Keep the project context.

Help project teams prepare traceable RFIs, organize revision-sensitive records, and bring commercial changes to the right reviewer.

RFI workspace
A useful handoff

A field question with its context.

A field question with its context.
ReferenceCheckNext step
Marked-up drawingSuperseded issueConfirm current reference
Related RFISimilar question foundCheck response context
Field locationDetail not identifiedCoordinator to clarify

Keep the question, document status, and missing detail together.

Built around your work
The work behind the industry

Where the day
gets held up.

The field, design team, subcontractor, and commercial owner often work from different document snapshots. A useful coordination layer keeps project identity and decision authority attached to the question instead of inventing a confident technical answer.

Sound familiar?

  • Project coordinators spend time finding the drawing revision behind each field question.

  • Related RFIs and confirmed responses are difficult to trace across document updates.

  • Commercial reviewers need changed wording and supporting records collected before a decision.

A useful first project

One workflow.
A concrete handoff.

Choose one project and discipline. Agree source status, participant access, RFI routing, and the authorized design and commercial reviewers.

Scope a first project
Project outline01

Prepare RFIs for one project discipline

Bring these inputs
  • Field question and markup
  • Controlled drawing register
  • Existing RFI and response log
The prepared output
A coordinator-ready RFI draft with source references, potential duplicates, and unresolved questions.
The person who reviews it
RFI coordinator, with the designated design authority responsible for the technical response.
What we would test
Use matching sheet numbers from separate projects and a superseded response. The draft must retain the correct project and issue status and surface any missing reference.
Tangible work

What the team takes away.

01

A source-linked RFI draft

The field question beside controlled drawing references and relevant prior responses.

02

A commercial review pack

Changed scope wording and supporting records prepared for the commercial owner, not automatic entitlement claims.

03

A project handover register

Confirmed decisions, open questions, and record ownership kept distinct during team changes.

Built for the setting

The details
that shape the scope.

01

Project separation is mandatory

Similar sheet numbers, subcontractor names, and room references occur on unrelated jobs. Search and drafts must remain within approved project access.

02

Issue status is not just a date

Tender, construction, superseded, and approved-for-specific-use documents have different roles. The document register must determine what can be relied on.

03

A response can change obligations

An RFI answer is not automatically a change order or notice to proceed. Design, commercial, and field authorities need separate decision records.

Test the awkward cases.

Test two projects with the same sheet number, a superseded bulletin, a missing referenced detail, and a response that needs a separate commercial review.

The help behind the workflow

Choose the work.
Then the right service.

Explore all services ↗
A few useful answers

Before we begin.

Which project is a useful place to start?

Choose a project with an active RFI coordinator and a maintained document register. Limit the first workflow to one discipline so the correct drawing status and response authority can be checked together.

Can the workflow use our existing project records?

Yes, the existing document register and RFI log are the starting sources to assess. Confirm their export or integration options and preserve project identity, revision, and issue status through the handoff.

Can it recommend how to build a detail?

No. Technical design interpretation and construction instructions require the responsible professionals and the project’s approved procedures.

Does it decide whether a change is payable?

No. It can assemble the relevant records. Entitlement, notice requirements, and commercial acceptance are decisions for authorized reviewers and counsel where needed.

Your next step / Construction

Show us the part
that needs to work better.

Choose one project and discipline. Agree source status, participant access, RFI routing, and the authorized design and commercial reviewers.

Plan a project

Start with a project brief.